OAKLAND, Calif. — Four East Oakland street corridors remain in the design-and-contracting pipeline for a project intended to reduce speeding, make neighborhood crossings safer and connect residents to schools, libraries, parks and other destinations. The city's Calm East Oakland Streets project page says in an October 2026 update that final design is nearly complete and that construction contract advertising and award are expected in the first half of 2027.

Which blocks are involved?

The Oakland Department of Transportation identifies four route groups: Hamilton Street–Rudsdale Street–D Street–Royal Ann Street between 69th and 105th avenues; Foothill Boulevard–Arthur Street–Plymouth Street between 64th and 79th avenues; 81st Avenue between San Leandro Street and Bancroft Avenue; and 85th Avenue between San Leandro Street and Bancroft Avenue. These are specific neighborhood corridors, not an announced citywide construction program.

Potential changes described by the city include safer crossings at major roadways, street and sidewalk repairs, curb ramps, drainage work, pavement markings, speed cushions, traffic circles and curb extensions. Selected streets could also have measures intended to discourage high-speed cut-through driving. These are design elements under consideration; residents should consult the completed plans to determine the specific treatment on their own block.

Funding and schedule require careful reading

The California Transportation Commission recommended $17.3 million in Active Transportation Program funding for the project in February 2021, according to the city. That historical recommendation is not a new November 2026 grant announcement. The more recent city update addresses design progress and the expected contract stage. A contract has not been identified here as awarded, and the project webpage does not demonstrate construction has begun on all four corridors.

The initiative grew from Oakland's 2019 bicycle-plan update, when residents identified neighborhood routes that were intimidating to people walking or biking. The city says it undertook extensive outreach and temporary street-design demonstrations in previous years. The questions worth tracking now are the final approved drawings, block-by-block construction schedule, access during work and measurements of crashes and speeding once improvements are in place.

Primary source: City of Oakland / OakDOT, Calm East Oakland Streets, October 2026 update.

Help Oakland News grow Help strengthen reporting on Oakland: community voices, important decisions and local life.
Support Oakland News

Choose how to support Oakland News:

Credit / Debit Card via Stripe

Choose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.

Continue with PayPal Continue with Zelle

Zelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.

Optional reader support. When possible, add “Oakland News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.

Oakland News — Your Community Newspaper

Have a correction, news tip, local announcement, or story to submit? Contact our editorial team. All submissions are reviewed before publication.

Contact the Oakland News newsroom →

More from Oakland News

Visit Oakland News →

COMMUNITY

Comments

Join the California58 conversation. You must be signed in to comment.